SCI was contracted to perform structural and historically accurate repairs at this facility which was severely damaged during the landing of Hurricane Katrina. SCI personnel and management worked closely with the VA’s on-site engineer to rebuild several buildings on the grounds to current code requirements, all while maintaining the aesthetic of the buildings as envisioned by the original design team.